Case Study
Integrated Downstream Energy Company
Learn how this integrated downstream energy company replaced PI ProcessBook with dataPARC, scaling to over 850,000 tags while delivering a cost-effective solution that won over users during a pilot phase.
Company’s Story
During a pilot phase, this integrated downstream energy company tested dataPARC tools and received overwhelmingly positive feedback. The intuitive interface and advanced features quickly won over users, leading the site to expand the implementation and add the dataPARC historian. The platform now handles over 850,000 tags with exceptional scalability and speed.
“The intuitive interface and advanced features quickly won over users, leading the site to go all in and add on the dataPARC historian.”
Company’s Challenges
The site needed to replace PI ProcessBook with a more capable and cost-effective solution. With a significant number of active users and over 850,000 tags to manage, scalability and performance were critical requirements.
The dataPARC Solution
dataPARC proved cost-effective compared to AVEVA’s PI Vision, offering comparable or better performance at a lower cost. The platform demonstrated exceptional scalability, handling over 850,000 tags effortlessly. User adoption was swift thanks to the intuitive interface and advanced features, which won over the team during the pilot phase.
More Success Stories

Drax Biomass
See how Drax Biomass developed an organization-wide data management strategy for their pellet production operations.

Energy Transfer
See how Energy Transfer underwent a complete digital transformation, saving them time, money, and enabling better decision-making.

Western Plains Energy
See how Western Plains Energy developed data-driven insights and improved product quality and process efficiency at their ethanol plant.